| Number |
Title |
Author(s) |
Date |
Status |
|
| n/a |
T1.679 for NGES Information
This document is not permitted to be distributed outside of ESIF-NGES and is intended to be used solely for reference in the development of ESIF standards. |
ATIS PTSC |
5/15/09 |
Information |
n/a |
| ESIF-NGES-2009-004 |
Issue 49 - Considerations for an Emergency Services NGN |
Bob Sherry, Intrado, Inc. |
1/9/09 |
Information |
49 |
ESIF-NGES-2008-012
ESIF-NGES-2008-012R1 |
Issue 58 - Parameter Conveyance for Location Determination of Devices
Attached To Access Networks |
Martin Dawson, Andrew Corp. |
12/5/08 |
Information |
58 |
| ESIF-NGES-2008-011 |
Issue 49 - Emergency Services Standards Initiatives |
Bob Sherry, Intrado, Inc. |
7/30/08 |
Information |
49 |
| ESIF-NGES-2008-010 |
Issue 58 - Stage 3 Continuation |
Martin Dawson, Andrew Corp. |
7/30/08 |
Information |
58 |
| ESIF-NGES-2008-009R2 |
Issue 58 - Stage 3 v1.3 |
NGES |
9/10/08 |
Information |
58 |
| ESIF-NGES-2008-009R1 |
Issue 58 - Stage 3 v1.2 |
Bob Sherry, Intrado, Inc. |
8/13/08 |
Information |
58 |
| ESIF-NGES-2008-009 |
Issue 58 - Stage 3 v1.1 |
Martin Dawson, Andrew Corp. |
7/30/08 |
Information |
58 |
| ESIF-NGES-2008-008 |
Issue 58 - Technical Report Stages 1 & 2 |
David Irwin, E911 Program |
7/7/08 |
Information |
58 |
| ESIF-NGES-2008-007 |
Issue 58 - Stage 3 Work Kickoff |
Martin Dawson, Andrew Corp. |
4/29/08 |
Information |
58 |
| ESIF-NGES-2008-006 |
NG Emergency Services Standards
Joint ESIF/PTSC/WTSC Meeting Presentation
|
Christian Militeau,
Intrado |
4/17/08 |
Information |
49, 58 |
| ESIF-NGES-2008-005 |
Comment Consideration Report for EISI |
Christian Militeau, Intrado
|
2/8/07 |
Information |
55 |
| ESIF-NGES-2008-004R3 |
Comments on the NENA i3 (Stage 2) Document |
Bob Sherry, Intrado |
5/12/08 |
Information |
49 |
| ESIF-NGES-2008-004R2 |
Comments on the NENA i3 (Stage 2) Document |
Bob Sherry, Intrado |
4/09/08 |
Information |
49 |
| ESIF-NGES-2008-004R1 |
Comments on the NENA i3 (Stage 2) Document |
Bob Sherry, Intrado |
4/04/08 |
Information |
49 |
| ESIF-NGES-2008-004 |
Comments on the NENA i3 (Stage 2) Document |
Bob Sherry, Intrado
|
1/25/08 |
Information |
49 |
| ESIF-NGES-2008-003R6 |
Parameter Conveyance for Location Determination Devices Attached to an Access Network
Formerly Titled: Issue 58 Documents- (Stage 0,1,and 2) |
Martin Dawson, Andrew Corp. |
5/21/08 |
Information |
58 |
| ESIF-NGES-2008-003R5 |
Parameter Conveyance for Location Determination Devices Attached to an Access Network
Formerly Titled: Issue 58 Documents- (Stage 0,1,and 2) |
Martin Dawson, Andrew Corp. |
4/17/08 |
Information |
58 |
| ESIF-NGES-2008-003R4 |
Issue 58 Documents- (Stage 0,1,and 2) |
Martin Dawson, Andrew Corp. |
4/09/08 |
Information |
58 |
| ESIF-NGES-2008-003R3 |
Issue 58 Documents- (Stage 0,1,and 2) |
Martin Dawson, Andrew Corp. |
3/26/08 |
Information |
58 |
| ESIF-NGES-2008-003R2 |
Issue 58 Documents- (Stage 0,1,and 2) |
Martin Dawson, Andrew Corp. |
2/27/08 |
Information |
58 |
| ESIF-NGES-2008-003R1 |
Issue 58 Documents- (Stage 0,1,and 2) |
Martin Dawson, Andrew Corp. |
2/13/08 |
Information |
58 |
| ESIF-NGES-2008-003 |
Issue 58 Documents- (Stage 0,1,and 2) |
Martin Dawson, Andrew Corp. |
1/22/08 |
Information |
58 |
| ESIF-NGES-2008-002 |
NENA Functional and Interface Standards for Next Generation 9-1-1 version 1.0 (i3)
Dated 12-18-07
|
NENA |
12/18/07 |
Information |
49 |
| ESIF-NGES-2008-001R3 |
NGES Comments on the PTSC-SAC Clarifications to Questions from ESIF-NGES Regarding the NENA i3 Stage 2 Document |
Bob Sherry, Intrado |
3/26/08 |
Information |
49 |
| ESIF-NGES-2008-001R2 |
PTSC-SAC Response to Questions from ESIF-NGES for NENA i3 Stage 2 Document |
Martin Dolly, AT&T |
2/27/08 |
Information |
49 |
| ESIF-NGES-2008-001 R1 |
NGES Comments on the PTSC-SAC Comments and Questions on Section 4 & 5 of the Functional and Interface Standards for Next Generation 9-1-1 version 1.0 (i3) |
Bob Sherry, Intrado |
1/31/08 |
Information |
49 |
| ESIF-NGES-2008-001 |
PTSC-SAC Comments and Questions on Section 4 & 5 of the Functional and Interface Standards for Next Generation 9-1-1 version 1.0 (i3) |
Martin Dolly, AT&T |
01/15/07 |
Information |
49 |
| NGES-045 |
PTSC Related E911 Work |
Martin Dolly, AT&T |
11/14/07 |
Information |
49 |
| NGES-044 |
ESIF-NGES/ PTSC-SAC Joint Conference Call Agenda Nov. 14, 2007 |
Christian Militeau, Intrado |
11/12/07 |
Information |
49 |
| NGES-043 |
Functional and Interface Standards for Next Generation 9-1-1 version 1.0 (i3) |
NENA |
11/07/07 |
Information |
49 |
| NGES-042 |
Presentation on Issue 58 Requirements |
Martin Dawson, Andrew Corp. |
10/25/07 |
Information |
58 |
| NGES-041R4 |
Comments on NENA i3 TRD |
Bob Sherry |
12/19/07 |
Information |
49 |
| NGES-041R3 |
Comments on NENA i3 TRD |
Bob Sherry |
12/05/07 |
Information |
49 |
| NGES-041R2 |
Comments on NENA i3 TRD |
Bob Sherry |
11/07/07 |
Information |
49 |
| NGES-041R1 |
Comments on NENA i3 TRD |
Bob Sherry |
10/25/07 |
Information |
49 |
| NGES-041 |
Comments on NENA i3 TRD |
Bob Sherry |
10/17/07 |
Information |
49 |
| NGES-040 |
NENA i3 Technical Requirements Document
|
Bob Sherry |
10/10/07 |
Information |
49 |
| NGES-039 |
Issue 58 Problem Statement |
Martin Dawson, Andrew Corp. |
9/25/07 |
Information |
58 |
| NGES-038 |
Incremental Requirements to NENA i3 |
Bob Sherry |
9/24/07 |
Information |
49 |
| NGES-037 |
Qualcomm Comments on Issue 50 |
Kirk Burroughs |
8/15/07 |
Information |
50 |
| NGES-036 |
Scope Questions Around NGES Development of Location Determination Work |
Roger Marshall |
8/1/07 |
Information |
58 |
| NGES-035 |
NENA/NGES Standards Output Regarding IMS ESInet/EIMS |
Roger Marshall |
7/31/07 |
Information |
|
| NGES-034R1 |
Proposed Response to PTSC Liaison of July 24, 2007 |
Bob Sherry |
8/7/07 |
Information |
|
| NGES-034 |
Proposed Response to PTSC Liaison of July 24, 2007 |
Bob Sherry |
7/31/07 |
Information |
|
| NGES-033 |
NENA i3 Standards Status |
Roger Marshall |
7/19/07 |
Information |
49 |
| NGES-032 |
ESIF's Role in Defining IMS-Based Emergency Services |
Bob Sherry |
7/19/07 |
Information |
49 |
| NGES-031 |
LIS-ALE Architecture and FLAP |
Andrew Corporation |
7/18/07 |
Information |
|
| NGES-030 |
Qualcomm Comments on NGES-050-002-R4E |
Kirk Burroughs |
6/2/07 |
Information |
50 |
| NGES-029 |
Andrew Corporation Comments on NGES-050-002-R4E |
Martin Dawson |
6/1/07 |
Information |
50 |
| NGES-028 |
Qualcomm Comments on NGES-050-002-R4D |
Kirk Burroughs |
5/30/07 |
Information |
50 |
| NGES-027 |
Qualcomm Comments on NGES-050-002-R4C |
Kirk Burroughs |
5/17/07 |
Information |
50 |
| NGES-026 |
NGES/PTSC Joint Meeting at ESIF-21, Minneapolis |
Bob Sherry |
5/2/07 |
Information |
49 |
| NGES-025R1 |
Comments on TIA Feedback |
Andrew Corporation |
5/9/07 |
Closed |
|
| NGES-025 |
Comments on TIA Feedback |
Andrew Corporation |
4/24/07 |
Closed |
|
| NGES-024R2 |
Emergency Services IP Multimedia Subsystem (EIMS) |
Intrado |
4/24/07 |
Information |
49 |
| NGES-024R1 |
Emergency Services IP Multimedia Subsystem (EIMS) |
Intrado |
6/30/07 |
Information |
49 |
| NGES-024 |
Emergency Services IP Multimedia Subsystem (EIMS) |
Intrado |
4/24/07 |
Information |
49 |
| NGES-023 |
Contribution for Section 9 |
Intrado |
2/14/07 |
Closed |
n/a |
| NGES-022-R1 |
Draft to 3GPP and 3GPP2 as part of the IMS-i2 integration |
Andrew Corporation |
4/5/07 |
Information |
n/a |
| NGES-022 |
Draft to 3GPP and 3GPP2 as part of the IMS-i2 integration |
Andrew Corporation |
2/14/07 |
Information |
n/a |
| NGES-021-R2 |
Comments on "Location Acquisition and Location Parameter Conveyance for Internet Access Networks in Support of Emergency Services"
|
Columbia University |
2/1/07 |
Closed |
n/a |
| NGES-021-R1 |
Comments on "Location Acquisition and Location Parameter Conveyance for Internet Access Networks in Support of Emergency Services"
|
Columbia University |
1/4/07 |
Closed |
n/a |
| NGES-021 |
Location Acquisition and Location Parameter Conveyance for Internet Access Networks in Support of Emergency Services |
Columbia University |
1/11/07 |
Information |
n/a |